Welcome to Little Dipper Forge!!!

Glad you could visit!

Home
About Us
The Shop
Photos
Gallery
Current Projects
Garden Blog
Bee Blog
Whats up
Travels
Quilts
Teaching Classes
AACB President Comments
Contact Us
Links
Rivets
 

What is happening with the shop?

The shop is completed.  I intended to post photos as the construction progressed, but......  It is 42 feet by 45 feet in area with a 12 foot eave line, one 12 foot door, one 10 foot door, one man-door, a concrete floor all around and three flues through the roof for forge ventillation (smoke stacks).  I have installed an automobile hoist (seven foot long hydraulic cylinder) in the floor on one side of the shop since I do all my own mechanic work (virtually), and have added several heavy duty storage racks for lots and lots of storage.  Most everything I use is heavy, therfore the sturdy storage.  The electricians I asked for quotes would not give one - I guess it isn't a big enough job.  So a very good friend, Lonnie Farmer, and I completed it.  The stacks are through the roof.  The hoods are completed.  I am in the planning stages for the three forges, stands for the post vices and a concrete slab for the power hammer.  I plan on three forges (one gas and two coal/charcoal) and one power hammer for now.   I made a steel rack and uploaded (ha! ha!) all the steel onto it.  I have a huge layout table (I bought that from a fellow blacksmith).  The landscaping is coming along slowly.  Jane recently added a path, a swing for meditation and a blacksmith whirl-a-gig she got me for Christmas one year.  It is supposed to inspire me to hammer that fast and hard!  I will have to get her to help me organize all my tools.  I am on my way!!!  

 

 

~~~~~~~~~~~~~~~~~~SHOP SITE~~~~~~~~~~~~~~~~~~~~~~~~ 

BEFORE  2/2007

 

 

AFTER 1/2009

 

AFTER 4/2009